Utility Watch · Sorsogon
Sorsogon is split between two cooperatives under two different regulators, which is unusual and worth knowing. SORECO II sits under the Cooperative Development Authority rather than NEA, and it does have an interruptions page on its own site, last updated in March 2026.
The franchise map
Every one of the 15 cities and municipalities in Sorsogon is served by exactly one of these, checked against the PSGC list both ways.
Table scrolls sideways
| Utility | Cities and municipalities | LGUs | Connections | Regulator |
|---|---|---|---|---|
| SORECO I Sorsogon I Electric Cooperative |
Bulan, Bulusan, Casiguran, Irosin, Juban, Magallanes, Matnog, Santa Magdalena | 8 | 66,526 | NEA-EC |
| SORECO II Sorsogon II Electric Cooperative |
Barcelona, Castilla, Donsol, Gubat, Pilar, Prieto Diaz, Sorsogon City | 7 | 93,149 | EC-CDA |
Publishing channel
A utility with no check date has not been looked at yet, and the table says that instead of guessing. Every graded row carries the page it was read from.
Table scrolls sideways
| Utility | Channel | What was there |
|---|---|---|
| SORECO I | Not checked yet | Not established. Not yet verified. |
| SORECO II | On its own site, stale checked 2026-08-20 |
Its own website, a fixed page rather than an archive. Two notices, both dated March 2026, so five months old at the time of checking. The page also carries an outage hotline, 0919 079 3680. Having the page and letting it go stale is its own kind of answer. source |
Reported by residents
Nothing yet for Sorsogon. That is a statement about this record, not about the power supply.
Nobody has filed a power interruption for Sorsogon through this site. An empty record means no reports, and no reports is not the same as no outages.
first report opens this
Nothing from SORECO I and SORECO II has been copied in yet. Advisories get recorded with the control number intact so an amendment can be matched to the original.
needs a published notice
How this fills up. Two ways. Residents report through the form, and published advisories from SORECO I and SORECO II get copied in with their control numbers. Albay is further along only because that is where the reporting started, and you can see the shape it takes at Albay.
Method
What is still missing, and the number each one is waiting on. With no records yet, all of these are off.
Needs 5 or more restored records. One record would be itself wearing a statistic’s name.
needs 5 restored · have none
Needs the same barangay to appear more than once.
needs a repeat · have none
Needs a total outage count. We only know about the ones somebody reported, so there is no denominator yet.
needs 30 days of reports
The control number carries the type, SI for scheduled and EI for emergency, so this becomes countable as soon as there are enough advisories to count.
needs 3 months
Off until reports are dense enough to show barangay shapes. Never at house level, at any zoom.
needs report density
These need customers-interrupted counts per feeder, which only the cooperative holds. Filed figures requested from the ERC.
requested under FOI
How to argue with this page. Every figure carries the source it came from and the date it was read. No motive is inferred: if an announcement states no reason, the record says not stated. Public social posts count as corroboration, never as a household. Anything here can be disputed by anyone, including the cooperatives, through corrections.